This is the last stage of "Rough Construction." The following tasks are completed at this stage before your Construction can start the "Finish Stages" of your home:
- Rough plumbing installed.
- Rough HVAC (Heating, Ventilation, and Air-Conditioning) installed.
- Rough electric installed.
- Rough frame inspections (municipal inspections: mechanical, plumbing, electrical and frame) completed.
- Batts installed (wall insulation).
- Drywall stacked or scheduled.
- In some locations, flat work (sidewalks, patios and driveways) is formed, and the concrete is poured.
Construction related hazards associated with this stage of construction:
- Lots of loose and hanging material.
- Tripping hazards exist from excess material that may not be removed.
- Puncture hazards may exist from boards with exposed nails or rough wiring not yet secured.