Pre-Drywall/Rough-ins

This is the last stage of "Rough Construction." The following tasks are completed at this stage before your Construction can start the "Finish Stages" of your home:

  • Rough plumbing installed.
  • Rough HVAC (Heating, Ventilation, and Air-Conditioning) installed.
  • Rough electric installed. 
  • Rough frame inspections (municipal inspections: mechanical, plumbing, electrical and frame) completed.
  • Batts installed (wall insulation).
  • Drywall stacked or scheduled.
  • In some locations, flat work (sidewalks, patios and driveways) is formed, and the concrete is poured.


Construction related hazards associated with this stage of construction:

  • Lots of loose and hanging material.
  • Tripping hazards exist from excess material that may not be removed.
  • Puncture hazards may exist from boards with exposed nails or rough wiring not yet secured. 

Learn More

Bramlett Homes, LLC

Copyright © 2025 Bramlett Homes, LLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept