Pre-Drywall/Rough-ins

This is the last stage of "Rough Construction." The following tasks are completed at this stage before your Construction can start the "Finish Stages" of your home:

  • Rough plumbing installed.
  • Rough HVAC (Heating, Ventilation, and Air-Conditioning) installed.
  • Rough electric installed. 
  • Rough frame inspections (municipal inspections: mechanical, plumbing, electrical and frame) completed.
  • Batts installed (wall insulation).
  • Drywall stacked or scheduled.
  • In some locations, flat work (sidewalks, patios and driveways) is formed, and the concrete is poured.


Construction related hazards associated with this stage of construction:

  • Lots of loose and hanging material.
  • Tripping hazards exist from excess material that may not be removed.
  • Puncture hazards may exist from boards with exposed nails or rough wiring not yet secured. 