The following tasks are complete at this stage:
- Exterior sheathing installed.
- Window installed.
- Roof sheathing completed.
- Roof nailing completed.
- Roof tiles or shingle material loaded.
- Water intrusion inspection completed.
Construction related hazards associated with this stage of construction (Hard Hat Recommended):
- Temporary wall supports, lateral bracing.
- Temporary stairs not yet secured with fall protection.
- Loosely stacked construction material (4 X 8 sheets of plywood or roof sheathing).